午夜三级在线-午夜三级毛片-午夜三级黄色片-午夜日韩视频-韩国A片国产浪潮AV-韩国高清不卡一区二区

Jiangmen hardware accessories factory analyzes its mold processing process arrangement

2019-12-29 1351

  Mold making refers to the processing of forming and blank making tools, in addition to shear mold and die-cutting mold. Generally, the mold has two parts: upper mold and lower mold. The steel plate is placed between the upper and lower dies to realize the material forming under the action of the press. When the press is opened, the workpiece determined by the die shape will be obtained or the corresponding waste materials will be removed. As small as electronic connector, as large as the automobile dashboard, the workpiece can be molded with mold. Progressive die refers to a set of die which can automatically move the workpiece from one station to another and get the forming parts at the last station. Die processing technology includes: cutting die, blanking die, compound die, extrusion die, four slide die, progressive die, stamping die, die cutting die, etc.

  Process flow arrangement

  1. Bottom surface processing, processing quantity guarantee;

  2. Casting blank datum alignment, 2D and 3D mold surface allowance inspection;

  3. Rough machining of 2D and 3D profile, non installation non working plane (including safety platform surface, buffer installation surface, pressing plate plane and side datum plane);

  4. Before semi finishing, the side datum should be aligned correctly to ensure the accuracy;

  5. Semi finish machining of 2D and 3D profile, finish machining of all kinds of installation working surfaces (including limit block installation surface and contact surface, insert installation surface and back side, punch installation surface, waste cutter installation surface and back side, spring installation surface and contact surface, all kinds of travel limit working surface, wedge installation surface and back side), semi finish machining of all kinds of guide surfaces and guide holes, leaving allowance for finish machining process Datum hole and height datum, and record data;

  6. Check and recheck the machining accuracy;

  7. Fitter setting process;

  8. Before finishing, align the reference surface of the process reference hole and check the allowance of the insert;

  9. Finish machining profile 2D, 3D, side punching profile and hole position, finish machining process reference hole and height reference, finish machining guide surface and guide hole;

  10. Check and recheck the machining accuracy.

  Jiangmen hardware accessories factory http://m.cunzha.cn//


主站蜘蛛池模板: 国产一区二区三区在线视频 | 久久久久精品久久久久影院蜜桃 | 男女羞羞下面好湿视频 | 高h喷水荡肉爽文np肉色学校 | 欧洲丰满少妇做爰视频爽爽 | 国产成人精品第一区二区三区 | 91欧美激 | 国产高清无码精油按摩 | 国产精品无码久久久久av | 久久久免费观看 | 91看片网站免费看 | 中文字母在线免费观看视频网站 | 精品欧美一区二区三区久久久 | 国产喷水一区二区三区蜜臀 | 成人欧美一区二区三区在线播放 | 伦理片免费完整片在线观看 | 波多野结衣办公室jian 情 | 中文人妻AV久久人妻水蜜桃 | 精品成人黄色视频 | 成人做爰视频WWW在线观看 | 亚洲精品久久久久久久久久久 | 精品无码人妻一区二区三区品 | 国产精品人人妻人人爽人人牛 | 国产三级电影免费观看 | 久久99精品一级毛片 | 国产精品va在线观看无码电影 | 国产精品1024视频 | 果冻传媒和91制片厂网站软件 | 日本19岁护士伦理在线 | 亚洲 欧美 bt | 18禁无遮拦无码国产在线 | 好爽毛片一区二区三区四无码三飞 | 2024亚洲欧美国产日韩亚洲欧美日韩精 | 国产午夜精品理论片久久影院 | 久久亚洲中文字幕不卡一区二区 | 国产精品国产三级国产专区 | 国产亚洲精品久久久无码网站 | 国产一区二区最新免费视频 | 日本又黄又爽gif动态图 | 国产精品一级av片 | 久久精品中文字幕老司机 |